


Hall bath remodel
Demo day: walls open to the studs and the subfloor bare. Slide to see the finished room.
Tub, tile, vanity, fixtures
Service 02 / 11
Designed with intention. Built to endure.
Real Deal Builders delivers bathroom remodels of every scale, from a powder room or guest bath to a complete master bathroom remodel.
Whether you are refreshing finishes, converting a tub to a walk in shower, expanding the space, or reimagining the layout, we run the job from start to finish, with our own crews and licensed specialists where the work calls for them.
The difference is in what you do not see. Proper waterproofing, quality substrates, clean plumbing behind the wall, and careful installation are the foundation of a bathroom that lasts.
From tile and vanities to fixtures and finishes, every element is chosen and set so the finished room reads as one space.
The short version
Our work
Real jobs, photographed on site. Drag a photo to compare. Each pair is lined up and cropped to the same frame, and the finished photos are not retouched.



Demo day: walls open to the studs and the subfloor bare. Slide to see the finished room.
Tub, tile, vanity, fixtures


The stained fiberglass pan came out for a hex mosaic floor and a square drain. The wall tile stayed.
Shower pan, mosaic floor, drain


From open framing to vertical navy tile walls and a white mosaic floor.
Framing to finish, wall tile, mosaic floor


From open framing to white subway tile and a patterned tile floor. The shower pan was still covered when this was shot.
Subway tile, patterned floor tile


Backer board and a mortar bed, then large wall tile, two glass mosaic niches, and a hex mosaic floor.
Wall tile, two niches, mosaic floor
The process
Behind the Tile
A bathroom that lasts starts beneath the surface. Proper waterproofing, a reinforced cement base, sealed corners, the correct slope in the shower pan, ventilation sized to the room, and properly finished joints are what protect the space from moisture over time.
We give the hidden layers the same attention as the finishes you see. Quality is not only how a bathroom looks. It is how it holds up years later.
Thoughtful Layouts. Purposeful Upgrades.
Whether it is converting a tub to a walk in shower, adding a double vanity, relocating plumbing, or moving up to large format tile, we plan every change with the whole room in mind.
In a master bathroom that can mean a full redesign, a new layout, a bigger shower, a double vanity, lighting, mirrors, and finishes. In a guest bath or powder room a focused update often delivers everything the space needs without unnecessary construction. We help you invest where it matters, so the money lands where you actually use the room.
From the framing to the final finish, every layer is planned for long term performance, and all of it sits under one contract and one schedule.
Our work
From first call to final walkthrough
We visit your home or property, listen to your goals, assess the space, and establish the scope of work.
You receive a written scope and a fixed price before any construction begins.
We coordinate every trade and phase in the proper sequence, with one dedicated point of contact keeping the project moving.
We review the completed work with you, address any final details, and make sure everything meets the Real Deal standard before we close the project.
Also see

Shower tile, floor tile, backsplash, and natural stone install over proper substrate.
View service →
Hardwood, vinyl plank, laminate, and tile, plus custom stair treads and risers.
View service →
Interior and exterior painting, cabinet painting and refinishing, with full surface preparation.
View service →Real Deal Builders delivers this service across the twenty cities we serve, from the Santa Clarita Valley into the San Fernando Valley. These pages cover the work city by city.
FAQ
The questions we hear most often, answered plainly. If your question is not here, call us and we will answer it the same way.
Both. We do full bathroom remodeling that changes the layout, converts a tub to a walk in shower, and rebuilds the plumbing under the room, and we also handle lighter cosmetic updates that swap tile, vanity, and fixtures over the existing footprint. We tell you which one fits your bath.
Yes. Walk in shower conversions are a regular part of our master bath work. It usually calls for a new shower pan, a properly waterproofed wall system, a linear or center drain, and sometimes a low or no threshold curb for an aging in place design. We handle all of it.
Yes. A master bathroom remodel usually means a bigger shower, a double vanity, better lighting, better ventilation, and a floor that reads as one plane rather than a small tile grid. We plan those pieces together so the master reads as one designed room rather than shopped items.
The standard is a waterproofing membrane, sheet or liquid applied, over the backer board and around all fixture penetrations, before any tile goes on. The shower pan gets a proper slope, a bonded pan liner, and the drain integrated into the membrane. Then thinset, tile, and grout. That order is what keeps water out of your framing.
Yes. Bathroom vanity installation is part of the standard scope. We handle the plumbing supply and drain, the mounting, the countertop, the sink, and the faucet, plus the outlets and lighting above the vanity if the electrical is part of your remodel.
A straight bathtub replacement where the plumbing stays put is usually one to two days plus the wall tile if we are replacing that too. A move to a walk in shower with new tile is a longer project because the whole wet wall gets rebuilt.
Porcelain and glazed ceramic are durable choices for wet areas and are easy to clean. Natural stone is beautiful but needs sealing. Large format tile reads modern and reduces grout lines. We walk you through the trade offs so the tile fits how you actually use the bath.
Bathroom flooring installation in porcelain tile is the long game answer. Luxury vinyl plank rated for wet areas is a lighter budget option that reads warm underfoot. We do not recommend real hardwood in a full bath, because a leak or a splash is a matter of when, not if.
A guest bath refresh commonly runs two to three weeks. A full master bathroom remodel with a walk in shower conversion and layout changes often runs four to five weeks. We give you a realistic schedule with the written quote.
A cosmetic refresh usually does not. Moving plumbing, moving the shower or tub, adding a fan where none existed, or moving electrical often does. We tell you plainly and handle the permit when the work needs it.
Cost is driven by the size of the bath, whether the plumbing moves, tile square footage, the vanity, and the fixture level you pick. A guest bath refresh and a full master bathroom remodel are very different projects. We price against a specific written scope.