Skip to content

Valencia, CA Licensed, bonded, insured CSLB #1130858

General Contractor & Kitchen Remodeler in Santa Clarita

Residential and commercial construction, from foundation to finish. Kitchens, bathrooms, additions, tile, flooring, and full renovations across the Santa Clarita Valley.

5.0 rating on Google Read reviews →
CSLB license
#1130858
Based in
Valencia
Services
15
Free quotes
Always

Why we created Real Deal

Building trust, one honest project at a time

We started Real Deal Builders to be the contractor people actually want to call back. That means clear scopes, honest pricing, and work that holds up long after the crew drives away.

1

Book consultation

Schedule a free consultation to walk the site and talk through your project.

2

Request quote

Get a detailed, custom quote tailored to your scope, with no surprises later.

3

Begin project

We get to work and deliver exceptional results, on time and on budget.

Where we work

Serving Santa Clarita and the San Fernando Valley

All locations →

Real Deal Builders works out of Santa Clarita and reaches across the San Fernando Valley and the wider region. See every city we serve on the locations page.

Trades we cover

The work we do

White kitchen with a quartz waterfall island and black dome pendant lighting
Kitchen remodeling
Bathroom with a freestanding tub and a glass enclosed tiled shower
Bathroom remodeling
Two story home addition with new glazing and finished exterior siding
Home additions

How long a kitchen remodel takes

A kitchen remodel runs seven phases across roughly nine weeks, and each one waits on the one before it. Scope and finishes change the total, but not the order.

Kitchen remodel phase timeline Seven phases across roughly nine weeks: design, demolition, rough-in, rough inspection, drywall and paint, cabinets and fixtures, flooring and trim. Project timeline 6 to 9 weeks typical Wk 1 Wk 2 Wk 3 Wk 4 Wk 5 Wk 6 Wk 7 Wk 8 Design + selections Scope, drawings, cabinets and finishes chosen Demolition Tear out, hidden condition discovery Rough plumbing + electrical All work behind the wall, before drywall closes Rough inspection City inspector signs off before walls close Drywall + paint Walls close, textures matched, primer and finish coats Cabinets + fixtures Set cabinets, install counters and plumbing fixtures Flooring + finish trim Final surfaces, base and trim, punch list Order matters: each trade sets up the next. Out of order means torn-open work later.
Scroll or swipe to see the full diagram. How a kitchen remodel sequences. Industry standard sequence for a kitchen remodel, six to nine weeks typical. Each phase depends on the previous one, which is why the order matters as much as the finishes.

What homeowners say

Reviews from Google

I had an excellent experience with Real Deal Builders in Valencia. I wanted a full kitchen replacement, and the project ended up involving much more than I expected. They helped relocate my plumbing and gas lines and handled it from start to finish. What impressed me most was the communication. None of my previous contractors compared.

Rick HubertGoogle review

They did an excellent job renovating both our kitchen and bathroom. They transformed our bathtub into a beautiful stand-up tiled shower, and in the kitchen they opened up the space, installed new cabinets and flooring, and added an island. His team was professional, hardworking, and gave me daily updates. Highly recommend.

Chris PerezGoogle review

We were looking to remodel one of our townhomes before renting it out, and we are so glad we found Real Deal Builders. Robert was thorough from the beginning, gave a complete cost breakdown, and there were never any surprise charges. The quality was outstanding. We hired them again for another unit.

Elizabeth MendozaGoogle review

See all reviews on Google →

What you can count on

Why homeowners keep calling us back

01

Honest quotes

You get a detailed written scope and price before any work starts, and we bring change orders to you before they hit an invoice.

02

One point of contact

One team, one schedule, one person who knows your project from the first walk to the final walkthrough.

03

Trades in the right order

Because we manage the sequence ourselves, plumbing waits for framing and paint waits for drywall, so nothing gets torn out twice.

04

The parts nobody sees

We hold framing, waterproofing, and the connections behind the wall to the same standard as the finishes you can see.

Get a free custom quote

Book a no cost, one on one walkthrough and we will price your project honestly, in writing, before any work begins.