Skip to content

Valencia, CA Class B Licensed Builder

General Contractor & Kitchen Remodeler in Santa Clarita Valley

Real Deal Builders is a licensed general contractor for kitchens, bathrooms, additions, tile, flooring and full renovations, with commercial work too. We build with our own crews and bring in licensed specialists where the job calls for them, so you deal with one contractor from the first walkthrough to the last.

5.0 rating on Google Read reviews →
CSLB license
#1130858
Based in
Valencia
Services
11
Written quotes
Every project

Our work

Recent kitchen, bathroom and tile work

Our own jobs, photographed on site: kitchens, bathrooms, tile, floors and outdoor work.

All services →

Start to finish

Bathroom before and after

One hall bath, photographed on demo day, mid job and finished. Drag the photo to compare, or pick a stage. The photos are lined up and cropped to the same frame, and the finished photo is not retouched.

The same hall bathroom finished, with a tiled tub surround, gray marble look floor tile, and a white double vanityHall bathroom gutted to the studs, with a bare subfloor and the window at the far endDemo dayAfter

Hall bath remodel

Demo day: walls open to the studs and the subfloor bare. Slide to see the finished room.

Tub, tile, vanity, fixtures

See more bathroom jobs →

What homeowners say

Reviews from Google

I had an excellent experience with Real Deal Builders in Valencia. I wanted a full kitchen replacement, and the project ended up involving much more than I expected. They helped relocate my plumbing and gas lines and handled it from start to finish. What impressed me most was the communication. None of my previous contractors compared.

Rick HubertGoogle review

They did an excellent job renovating both our kitchen and bathroom. They transformed our bathtub into a beautiful stand-up tiled shower, and in the kitchen they opened up the space, installed new cabinets and flooring, and added an island. His team was professional, hardworking, and gave me daily updates. Highly recommend.

Chris PerezGoogle review

We were looking to remodel one of our townhomes before renting it out, and we are so glad we found Real Deal Builders. Robert was thorough from the beginning, gave a complete cost breakdown, and there were never any surprise charges. The quality was outstanding. We hired them again for another unit.

Elizabeth MendozaGoogle review

See all reviews on Google →

Ready to talk about your project?

We come out to your property, walk the job, and put the scope and the number in writing before anything starts. The visit costs nothing and you are under no obligation after it.

Built on clarity. Backed by quality.

Your Santa Clarita general contractor

Real Deal Builders exists to raise the standard of contracting: clear scopes, plain pricing and craftsmanship that holds up. You get the scope and the price in writing before work starts, and if something changes along the way, we tell you first. Homeowners and business owners here deserve a contractor who explains the work and stands behind it.

A higher standard. From start to finish.

01

Consultation · Starts With a Conversation

We begin by understanding your vision, walking the site, and setting a clear plan for your project.

02

Proposal · Built Around You

You get a detailed proposal with a written scope, a fixed price, and no surprises later.

03

Built With Precision & Pride

Once approved, we begin on the agreed schedule and coordinate every trade, so each phase starts only when the one before it is finished.

Where we work

Serving Santa Clarita and the San Fernando Valley

All locations →

Real Deal Builders works out of Santa Clarita and reaches across the San Fernando Valley and the wider region. See every city we serve on the locations page.

How long a kitchen remodel takes

We run a kitchen remodel in seven phases across 6 to 9 weeks, and each one waits on the one before it. Scope and finishes change the total, but not the order.

Kitchen remodel phase timeline Seven phases across roughly nine weeks: design and selections, demolition, rough plumbing and electrical, rough inspections, drywall and paint, cabinets and countertops, flooring, trim and final details. Project timeline 6 to 9 weeks typical Wk 1 Wk 2 Wk 3 Wk 4 Wk 5 Wk 6 Wk 7 Wk 8 Design + selections Scope, drawings, cabinets and finishes chosen Demolition Tear out, hidden condition discovery Rough plumbing + electrical All work behind the wall, before drywall closes Rough inspections City inspector signs off before walls close Drywall + paint Walls close, textures matched, primer and finish coats Cabinets + countertops Set cabinets, install counters and plumbing fixtures Flooring, trim + details Final surfaces, base and trim, punch list Order matters: each trade sets up the next. Out of order means torn-open work later. Project timelineProject timeline6 TO 9 WEEKS TYPICALDesign + selectionsWeeks 1 to 2Scope, drawings, cabinets and finisheschosenDemolitionWeek 3Tear out, hidden condition discoveryRough plumbing + electricalWeeks 3 to 5All work behind the wall, before drywallclosesRough inspectionsWeek 5City inspector signs off before walls closeDrywall + paintWeeks 5 to 6Walls close, textures matched, primer andfinish coatsCabinets + countertopsWeeks 6 to 7Set cabinets, install counters and plumbingfixturesFlooring, trim + detailsWeeks 6 to 7Final surfaces, base and trim, punch listOrder matters: each trade sets up thenext. Out of order means torn-open worklater.
Scroll or swipe to see the full diagram. How a kitchen remodel sequences. Industry standard sequence for a kitchen remodel, six to nine weeks typical. Each phase depends on the previous one, which is why the order matters as much as the finishes.

What you can count on

Why homeowners keep calling us back

01

Written quotes

You get a detailed written scope and price before any work starts, and we bring change orders to you before they hit an invoice.

02

One point of contact

One team, one schedule, one person who knows your project from the first walk to the final walkthrough.

03

Trades in the right order

Because we manage the sequence ourselves, plumbing waits for framing and paint waits for drywall, so nothing gets torn out twice.

04

The parts nobody sees

We hold framing, waterproofing, and the connections behind the wall to the same standard as the finishes you can see.

Request a custom quote

Book a free walkthrough and we will price your project in writing before any work begins.